2025–2026 · Hospital building
Operating theatre HVAC reconstruction

Each operating theatre has autonomous temperature and humidity control, new air-handling units and dedicated air-exchange systems. The units are interconnected with a backup operation mode.
HEH role
Survey, brief detailing and design
Experience and projects



